Trojan Holding is considered as the one of the largest construction groups in Abu Dhabi

A multidisciplinary Construction Group of companies with in-house capabilities
to deliver Turn Key Projects.

It has a significant and growing presence locally and regional interests.



resource strength
Over 22,500
Multinational workforce
Plant & machineries worth over
AED 750 million
Over 25,000
Multinational workforce
Plant & machineries worth over
AED 402 million
 



DIRECT MANPOWER

11,400
Skilled labors
7,600
Unskilled labors

 
SPECIALISTS & ADMINISTRATION

310
Managers / Supervisors
1,340
Engineers
1,360
Technical
490
Administrative

SPECIALISTS & ADMINISTRATION

610
Managers / Supervisors
1,030
Engineers
1,052
Technical
693
Administrative

FINANCIAL PERFORMANCE
CONSOLIDATED (IN MILLION AED)

REVENUE CONTRIBUTION - GROUP COMPANIES

ORGANIZATIONS



CONSTRUCTION
MEP
FACTORIES
CONSTRUCTION
CONSTRUCTION
COMPANIES PROFILE


 
NPC & TGC registered as LLC in 2003 & 2009 respectively
100% owned by UAE Nationals
Classified by AD Municipality as special-grade contracting firms
Unlimited Category for NPC & TGC by Dubai Municipality
International Operation (Trojan)

COMBINED WORK PORTFOLIO


 
15 Years Operations
 
More than 150 small to
large projects
executed
 
37 Contracts
under execution
 
AED 9.3 Billion
current backlog
 
AED 10.25 Billion handed
over in the last 5 years
TGC/NPC CONFORMANCE RECORD
• Registered ISO 9001:2008, 14001:2004 & 18001:2007
• IMS widely practiced to include the following:
• ISO 14001
• OHSAS 18001

TGC/NPC CONFORMANCE RECORD
• Registered ISO 9001:2008, 14001:2004 & 18001:2007
• IMS widely practiced to include the following:
• ISO 14001
• OHSAS 18001


Accident frequency rate well below the international benchmark
• OSHA 1.7
• RIDDOR 1.6
Corporate Member of UAE Green Building Council


TGC/NPC TEAM


TGC/NPC PROJECT MILESTONES
17 ICON BAY

Location: Creek Harbour, Dubai, UAE
Client: Emaar
Consultant: WME Consultants
Status: Recently awarded
Details: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects to the buildings at 17 Icon Bay. The total built-up area for the project is approximately 71,000 m2.
Value: AED 263 million



NATION TOWERS

Location: Abu Dhabi, UAE
Client: International Capital Trading (ICT)
Consultant: WZMH Architects / KEO
Duration: 30 months
Status: Completed
Details: High-rise mixed-use development comprising of 65 flrs residential tower, 52 flrs hotel & offices. The tower is linked by a sky bridge at 203 m above ground, shopping mall, associated car parking and beach club with a total built up area of 320,000 m2.
Value: AED 1.6 billion (JV NPC-Arabtec)



MARINA SQUARE ZONE D

Location: Al Reem Island, Abu Dhabi, UAE
Client: Tamouh Investments LLC
Consultant: GDP Architects / APG
Duration: 29 months
Status: Completed
Details: Design & build of 2 residential towers 54 flrs and a 20 flrs residential building with associated parking. The total built up area is 230,000 m2.
Value: AED 736 million



MARINA SQUARE ZONE A

Location: Al Reem Island, Abu Dhabi, UAE
Client: Tamouh Investments LLC
Consultant: APG
Duration: 30 months
Status: Completed
Details: Design & build of 46 flrs residential tower with podium, a 39 flrs office tower and two 10 flrs residential buildings with total built up area of 145,000 m2.
Value: AED 505 million



DANAT TOWER

Location: Danat, Abu Dhabi, UAE
Client: Sorouh Real Estate
Consultant: EHAF Engineering
Duration: 20 months
Status: Completed
Details: Construction of 25 flrs residential tower consisting of 252 apartment units with a total built up area of 55,000 m2.
Value: AED 265 million



HORIZON TOWERS, CITY OF LIGHTS

Location: Al Reem Island, Abu Dhabi, UAE
Client: Tamouh Investments LLC
Consultant: Altourath Consultants
Duration: 30 months
Status: Completed
Details: Construction of mixed used development comprising of two 40 flrs & 60 flrs residential towers, 33 town houses, retail & 6 flrs podium for associated parking.
Value: AED 450 million



HYDRA AVENUE

Location: Al Reem Island, Abu Dhabi, UAE
Client: Tamouh Investments LLC
Consultant: Altourath Consultants
Duration: 30 months
Status: Completed
Details: Construction of mixed used development comprising of two 40 flrs & 60 flrs residential towers, 33 town houses, retail & 6 flrs podium for associated parking.
Value: AED 450 million



PALM TOWER

Location: Abu Dhabi, UAE
Location: Palm Jumeirah, Dubai, UAE
Client: Nakheel PJSC
Consultant: RSP
Duration: 24 months
Details: Construction, completion of 52 flrs mixed-use hotel tower comprising of 290 rooms & 502 fully furnished apartments on top of Palm Mall. The total built up area is 96,000 m2.
Value: AED 820 million

HARBOUR GATE TOWER

Location: Dubai Creek, Dubai, UAE
Client: The Lagoons Phase 1 LLC
Consultant: SSH Design LLC
Duration: 28 months
Status: In-progress

Details: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects of 2 residential towers (37 & 31 flrs), villas and amenities block, common podiums, basement and includes external works, external services and hard and soft landscaping at plot 30, Dubai Creek Harbour Development, Dubai. The total built-up area for the project is approximately 105,000 m2.

Value: AED 438 million



YAS WATER EDGE

Location: Yas Island, Abu Dhabi, UAE
Client: Aldar Properties
Consultant: WS Atkins & Partners Overseas
Duration: 32 months
Status: In-progress
Details: Construction, execution, completion, testing, commissioning, maintenance, including remedying of construct thirteen buildings 2B+G+P+9. The total built-up area is 340,000 m2.
Value: AED 1.3 billion



TOWER FOR SHEIHK KHALIFA BIN SULTAN BIN SHAKBOUT

Location: Abu Dhabi, UAE
Client: Al Shurfa Real Estate
Consultant: Syrconsult
Duration: 24 months
Status: Completed
Details: Construction of a commercial & residential building consisting of 21 flrs residential tower and associated parking.
Value: AED 97 million



PALM JUMEIRAH, GOLDEN MILE - 3

Location: Palm Jumeirah, Dubai, UAE
Client: The Palm Jumeirah Co. LLC
Consultant: Arif & Bin Touk
Duration: 18 months
Status: Completed
Details: Construction of proposed ground + 10 story with 3 level basement parking, commercial & residential building including all architectural, structural and MEP works.
Value: AED 75 million



AL NOOR TOWER

Location: Al Reem Island, Abu Dhabi, UAE
Client: Royal Development Company
Consultant: Baynouna
Duration: 16 months
Status: Completed
Details: Construction, completion and maintenance work of G+17 residential floors.
Value: AED 80 million



GOLF PLACE VILLAS - PHASE 1

Location: Dubai Hills Estate, MBR Community, Dubai, UAE
Client: Dubai Hills Estate
Consultant: Deewan Architect + Engineers
Duration: 19 months
Details: Design, construction, execution, completion, testing commissioning, maintenance of 57 villas (Type B and Type D).
Value: AED 185 million



HIGHLAND RESORT VILLAS

Location: Al Maqta, Abu Dhabi, UAE
Client: Midmak Properties
Consultant: WS Atkins
Duration: 30 months
Status: Completed
Details: 147 luxury water front & main land villas including infrastructure, MEP packages & marine works.
Value: AED 499 million



Marbella Village Townhouses

Location: Dubai Hills Estate , Dubai
Client: Dubai Hills Estate LLC
Consultant: Dewan Architects + Engineers
Duration: 19 months
Status: In-progress
Scope of Work: Design, Construction, Execution, Completion, Testing, Commissioning, Maintenance, including remedying of any defects marbella Village 96 townhouses at Dubai Hills Estate, Dubai.
Value: AED 1.1 billion

NALAYA COMMUNITY VILLAS

Location: Najmat Abu Dhabi, UAE
Client: Al Reem Developers
Consultant: RSP
Duration: 30 months
Status: Completed
Details: 42 luxury villas (3 types), club house, infrastructure & MEP packages
Value: AED 85 million



EMIRATI HOUSING DEVELOPMENT – AL AIN

Location: Jebel Hafeet, Al Ain, UAE
Client: Musanada / Tamouh Investments LLC
Consultant: Dorsh / ACE
Duration: 48 months
Status: Completed
Details: Design & build of 3,000 villas including associated infrastructure & MEP works
Value: AED 5 billion

AIN AL FAYDA EMIRATI HOUSING DEVELOPMENT

Location: Ain Al Fayda, Al Ain, UAE
Client: Musanada /Al Qudra
Consultant: Bureau Happold, Atkins / Alsalam
Duration: 48 months
Status: Completed
Details: Design & build of 2,000 villas including associated infrastructure and MEP works.
Value: AED 3.5 billion

HYDRA VILLAGE - ZONE 6

Location: Abu Dhabi, UAE
Client: Hydra Properties
Consultant: NEB
Duration: 18 months
Status: Completed
Details: Construction, completion & maintenance of 256 G+1 villas.
Value: AED 210 million

HYDRA VILLAGE - ZONE 8

Location: Abu Dhabi, UAE
Client: Hydra Properties
Consultant: NEB
Duration: 24 months
Status: Completed
Details: Construction & completion of 582 villas of similar type (2 bedroom).
Value: AED 270 million

EMIRATI HOUSING - YAS ISLAND

Location: Yas Island, Abu Dhabi, UAE
Client: PAL
Consultant: Professional Arabian Consulting Engineers
Duration: 18 months
Status: Completed
Details: Construction of 115 villas of two types including MEP works
Value: AED 150 million



AKOYA BY DAMAC - PHASE 1 VILLAS

Location: Dubailand, Dubai, UAE
Client: Damac Crescent Properties LLC
Consultants: AECOM
Duration: 24 months
Status: Completed
Details: Construction, completion, testing, commissioning and maintenance of the phase - 1 (446 Villas).
Value: AED 415 million



489 VILLAS AT NAD AL SHEBA

Location: Nad Al Sheba, Dubai,UAE
Client: Nakheel PJSC
Consultant: Arif & Bintoak
Duration: 30 months
Status: In-progress
Scope of Work: Construction, completion, testing, & commissioning of 489 villas (2 types) and associated infrastructure works - package 1.
Value: AED 850 million

MIRA OASIS

Location: Reem Development Phase 2, Dubai, UAE
Client: EMMAR Properties PSJ
Consultant: National Engineering Bureau
Duration: 30 months
Scope of Work: Construction, completion, testing, & commissioning of 1,393 villas.
Value: AED 1.4 billion

MAPLE PHASE 1, 2 & 3

Location: Abu Dhabi, UAE
Location: MBR Gardens, Dubai Hills Estate, Dubai, UAE
Client: Dubai Hills Estate LLC
Project Duration: 24 months
Consultants: Arif & Bintoak Consulting Architects & Engineer
Status: In-progress
Scope of Works:
Phase 1:646 Townhouses
Phase 2: 666 Townhouses
Phase 3: 562 Townhouses
Value: AED 1.6 billion

MUDON DEVELOPMENT – PHASE 3

Location: Abu Dhabi, UAE
Location: Dubailand, Dubai, UAE
Client: MDN Real Estate
Consultant: NAGA Architects Engineers Designers
Duration: 25 months
Status: In-progress
Scope of Work: Construction, completion, testing & commissioning of 668 + 496 villas.
Value: AED 4.7 billion

YAS ACRES

Location: Abu Dhabi, UAE
Location: Yas Island, Abu Dhabi, UAE
Client: Aldar Properties PJSC
Consultant: AECOM & Michael Chabowski Technical Service
Duration: 32 months
Status: In-progress

Scope of Work: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects of 652 nos. of villa and 18 nos. of external building works, all related electro-mechanical and landscape works within plot boundary at Yas Acres (North Yas), Yas Island, Abu Dhabi. It includes also golf course area and infrastructure works.

Value: AED 1.7 billion

AL SARFA VILLAS

Location: Dubai, UAE
Client: Meraas Development LLC
Consultant: U+A Architects
Duration: 12 months
Status: In-progress
Scope of Work: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects of 44 villas with swimming pool, 1 guard room and 2 living rooms.
Value: AED 115,656,878

AL SAMHA VILLAS COMPLEX

Location: Abu Dhabi, UAE
Client: Abu Dhabi General Services PJSC (Musanada)
Consultant: Dorsch Holding GmbH
Duration: 24 months
Status: In-progress
Scope of Work: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects of 250 Emirati villas including infrastructure works and supporting facilities like mosque, parks and sub-stations at Al Samha east & west, Abu Dhabi.
Value: AED 674 million

SIDRA 3 COMMUNITY

Location: Dubai, UAE
Client: Dubai Hills Estate LLC
Consultant: Al Gurg Consultants
Duration: 24 months
Status: In-progress
Scope of Work: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects of 339 of villas, all related electro-mechanical works and associated external works (within the villa boundary limit).
Approx. Built-up Area: 107,438.30 m2.
Value: AED 392 million

INSTITUTE OF APPLIED TECHNOLOGY

Location: Mohammed Bin Zayed City, Abu Dhabi, UAE
Client: Command of Military Works
Consultant: Syrconsult Engineering
Duration: 24 months
Details: Construction of 5 story educational complex (BUA 80,000 m2) for armed forces including MEP & external works packages.
Value: AED 376 million





VOCATIONAL EDUCATION DEVELOPMENT CENTER

Location: Abu Dhabi, UAE
Client: Command of Military Works
Consultant: Shaheen Engineering Consultancy
Duration: 23 months
Details: Leadership training bldg., service yard, accommodation bldg., community centre bldg., guard house and external infrastructure of total BUA 70,000 m2.
Value: AED 265 million



AL MUWEIJI SCHOOL

Location: Al Ain, Abu Dhabi, UAE
Client: Abu Dhabi Education Counsel (ADEC)
Consultant: WS Atkins
Duration: 18 months
Details: Construction of school for 1,250 students including external works.
Value: AED 105 million






ZONE K – YAS ISLAND

Location: Yas Island, Abu Dhabi, UAE
Client: ALDAR Properties PJSC
Consultant: KBR
Duration: 22 months
Details: Construction of school, mosque district retail & recreational club.
Value: AED 240 million

EMIRATES DIPLOMATIC ACADEMY

Location: Sector W59-02, Abu Dhabi, UAE
Client: Ministry of State Office
Consultant: Shape Architecture Practice & Research
Duration: 18 months
Status: Recently Awarded
Details: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects to the academic building, research center and the associated support facilities with surrounding landscaping. The total built-up area is 18,490 m2.
Project Value: AED 168 million



AMBULATORY HEALTHCARE CLINICS

Location: Al Falah & Mohd Bin Zayed, Abu Dhabi, UAE
Client: SEHA
Consultant: HDP overseas ltd.
Duration: 18 months
Details: Construction & maintenance of 2 clinics with all external works.
Project Value: AED 132 million



DANET HOLIDAY INN

Location: Danat Abu Dhabi, UAE
Client: Al Qudra Real Estate
Consultant: Architectural Engineering Consultants
Duration: 25 calendar months
Details: 203 rooms, 9-storey 4-star hotel with total built-up area of 33,000 m2.
Value: AED 149 million




AL RAHA BEACH HOTEL

Location: Al Raha, Abu Dhabi, UAE
Client: International Capital Trading
Consultant: RNL & Dewan Architects
Duration: 18 months
Details: Additional 4 floors with 144 rooms, 2 restaurants, underground parking with total built-up area of 22,000 m2.
Value: AED 170 million






ST REGIS HOTEL

Location: Corniche, Abu Dhabi, UAE
Client: ICT
Consultant: WZMH Architects / KEO
Duration: 30 months, part of Nation Towers project
Details: Construction & fit out for 283 rooms and suites including restaurants, health club, beach club, lounges, spa and swimming pools.
Value: AED 800 million including FF&E
(part of Nation Towers)




DEIRA WATERFRONT DEVT - PHASE 1

Client: Investment Corporation of Dubai, UAE
Lead Partner: SSANGYONG
Location: Deira, Dubai
Project Duration: 24 Months
Scope of Work: Construction, execution, completion, testing, commissioning of Deira Development Phase 1 (completion of plot 3-4 nos. residential, office and hotel towers and associated external work within the plot limits) at Deira Waterfront, Dubai, United Arab Emirates.
Value: AED 610 million




ROVE HOTELS

Location: Jumeirah 1, Dubai, UAE
Client: Rove Hospitality LLC
Consultant: Archgroup Consultants
Duration: 18 Months
Status: Recently Awarded
Details: Construction, execution, completion, testing, commissioning, maintenance, including remedying of any defects for Rove Hotel building at Jumeirah 1st Dubai, UAE. The scope of work includes civil, MEP services, general finishing, interior finishing, facade and landscaping works etc. The total built-up area for the project is approximately 22,766 m2.
Value: AED 140 million



DANET MALL

Location: Danet Abu Dhabi
Client: Hydra Properties
Consultant: NEB
Duration: 18 months
Details: A community shopping mall with stateof- the art facilities and amenities to serve the surrounding Danet residences and offices.
Value: AED 146 million




REEM EMIRATES ALUMINUM & GLASS FACTORY

Location: ICAD, Abu Dhabi, UAE
Client: Royal Group
Consultant: Serex International
Duration: 16 months
Details: Construction of offices & workshops for aluminum, glass processing & stainless steel fabrication.
Value: AED 150 million



SERVICE WORKSHOP & OFFICES

Location: Mafraq, Abu Dhabi, UAE
Client: Al Assala Trading LLC
Consultant: Chawla Architectural & Engineering
Duration: 10 months
Details: Construction, completion & maintenance of proposed service workshop and office including all external works.
Value: AED 34 million





IGG ADVANCED INDUSTRIES FACILITIES

Location: Tawazun Industrial Park
Client: IGG
Consultant: Noon Stride
Duration: 16 months
Details: Construction of advanced industries facilities including fabrication, storage areas and office block.
Value: AED 125 million




MOSQUE & QURAN MEMORIZATION CENTER

Location: Abu Dhabi, UAE
Client: HH Khalifa Bin Zayed Al Nayan Foundation
Consultant: Golden Planners
Duration: 24 months
Details: Mosque and Quran Memorization center for HH Khalifa Bin Zayed Al Nayan Foundation.
Value: AED 55 million



INFRASTRUCTURE
INFRASTRUCTURE
 




INFRASTRUCTURE DIVISION

OVERVIEW:
• NPC-Infra Division was established in 2005 as Infra Contractor In-House Trojan Holding
• NPC-Infra Division has executed major infrastructure development in Abu Dhabi.
• NPC-Infra Division has a total work portfolio of 3.3 billion AED.
• Total Man force of 1900 labors and engineers


PRODUCT RANGE:
• Main and Secondary Road
• Storm Water Networks
• Sewerage Networks
• Water Networks (main with distribution)
• Fire Services Networks
• Irrigation Networks
• Gas Networks
• Telecom Networks
• Power Civil Works / Sub stations
• Street Lighting
• Traffic Signals
• Pump Stations

RAWDHAT INFRASTRUCTURE WORKS

Location: Al Bateen, Abu Dhabi, UAE
Client: Reem Developers
Consultant: Ewan Engineering
Duration: 18 months
Details: Networks of road, drainage, sewer, power, waterline irrigation, street lighting, gas lines, & telecommunication.
Value: AED 200 million




NAJMAT ROADS & UTILITIES

Location: Al Reem Island, Abu Dhabi, UAE
Client: Reem Developers
Consultant: Hyder Consulting
Duration: 24 months
Details: Roads & utility works, Infrastructure & MEP packages.
Value: AED 353 million



JEBEL HAFEET INFRASTRUCTURE WORKS

Location: Al Ain, Abu Dhabi, UAE
Client: Musanada & Tamouh
Consultant: Dorch / Bureau Happold & ACE
Duration: 42 months
Details: Networks of road, drainage, sewer, power, waterline irrigation, street lighting & telecommunication.
Value: AED 1.94 billion



AIN AL FAYDA INFRASTRUCTURE WORKS

Location: Al Ain, Abu Dhabi, UAE
Client: Musanada / Alqudra
Consultant: Dorch / Bureau Happold & Alsalam
Duration: 42 months
Details: Networks of road, drainage, sewer, power, waterline irrigation, street lighting & telecommunication.
Value: AED 1.1 billion

LU’LUAT RAHA BRIDGE & INFRASTRUCTURE WORKS

Location: Al Raha Island, Abu Dhabi, UAE
Client: International Capital Trading
Consultant: Mouchel Consulting
Duration: 20 months
Details: Construction, completion & maintenance of main bridge, road works, utility.
Value: AED 96 million

AL DANA PHASE II INFRASTRUCTURE WORKS

Location: Al Raha Beach, Abu Dhabi, UAE
Client: Aldar Properties PJSC
Consultant: Hyder Consulting
Duration: 11 months
Details: Construction, completion & maintenance of marine works, road works, electrical works, water works, telecom works, sewerage works, surface water works, irrigation works, gas works, central waste management facility, district cooling piping works, 3 bridges works and sewerage pumping station.
Value: AED 103 million

BRIDGES (PACKAGE 1) WORKS FOR NAJMAT DEVELOPMENT

Location: Al Reem Island, Abu Dhabi, UAE
Client: Reem Developers
Consultant: Hyder Consulting
Duration: 12 months
Details: Construction of 2 Bridges for Najmat Abu Dhabi consisting of two identical vehicular bridges of 62m long &18.50m wide and associated works including street lighting.
Value: AED 44 million



INFRASTRUCTURE WORKS FOR 380 VILLAS & ASSOCIATED COMMUNITY FACILITIES
INFRASTRUCTURE WORKS FOR 380 VILLAS & ASSOCIATED COMMUNITY FACILITIES

Location: Al Ain, Abu Dhabi, UAE
Client: Al Qudra Real Estate
Consultant: Al Salaam Consulting
Duration: 16 months
Details: Construction, completion, handing over and maintenance of infrastructure works for 380 commercial villas and associated community facilities which includes earth works, road works, storm water, potable water, irrigation works, sewerage works, fire service works, electrical works, street lighting, telecommunication works, dewatering works
Value: AED 89 million



INFRASTRUCTURE WORKS FOR HYDRA VILLAGE DEVELOPMENT ZONE 8
INFRASTRUCTURE WORKS FOR HYDRA VILLAGE DEVELOPMENT ZONE 8

Location: Shahama, Abu Dhabi, UAE
Client: Hydra Properties
Consultant: WS Atkins
Duration: 24 months
Details: Construction of entire transmission, distribution, removal networks, all connections internally, completion, commissioning, handover to authority, maintenance and remedying of any defects therein of the infrastructure works.
Value: AED 90 million



NAREEL ISLAND INFRASTRUCTURE & PUBLIC REALM
NAREEL ISLAND INFRASTRUCTURE & PUBLIC REALM

Location: Nareel Island, Abu Dhabi, UAE
Client: Aldar Properties
Consultant: KEO International
Duration: 16 months
Details: Construction of all infrastructure & Ancillary works and includes any post completion works.
Value: AED 180 million



AL MERIEF INFRASTRUCTURE & PUBLIC REALM

Location: Etihad Plaza, Abu Dhabi, UAE
Client: Aldar Properties
Consultant: KEO International Consultants
Duration: 16 months
Details: Construction of all infrastructure
& ancillary works and includes any post completion works.
Value: AED 266 million

REEM ISLAND - SECTOR RT2 & RT3 INFRASTRUCTURE AND UTILITY WORKS
REEM ISLAND - SECTOR RT2 & RT3 INFRASTRUCTURE AND UTILITY WORKS

Location: Abu Dhabi, UAE
Client: Al Tamouh Investment Company LLC
Consultant: M/S Hyder Consulting Engineers
Duration: 12 months
Details: Construction of all infrastructure & ancillary works and includes any post completion works.
Value: AED 18,261,010.00



CONSTRUCTION OF OVER BRIDGES 1 & 2, DUBAI HILLS ESTATE DEVL.
CONSTRUCTION OF OVER BRIDGES 1 & 2, DUBAI HILLS ESTATE DEVL.

Location: MBR Dubai Hills, Al Khail Road, Dubai, UAE
Client: Dubai Hills Estate
Consultant: Halcrow International
Duration: 12 months
Status: In-progress
Details: Construction of all infrastructure & ancillary works and includes any post completion works.
Value: AED 45 million



Riyadh City South Phase 1
Riyadh City South Phase 1

Location: Abu Dhabi
Client: MODON Properties PJSC
Consultant: Arcadis Consulting LTD
Duration: 24 Months
Status: In Progress
Details: Construction, Completion, Testing and Commissioning, Handover and Remedy of defect of construction of internal Roads and Infrastructure works for Al Sader Area, Abu Dhabi and all in accordance to drawings and specifications.
Value: AED 600 million



Mohamad Bin Zayed City Zone D & G

Location: Mohammad Bin Zayed City, Abu Dhabi
Client: Abu Dhabi General Services PJSC
Consultant: Altorath International Engineering Consultants LLC
Duration: 24 Months
Status: In Progress
Details: Construction, Completion, Testing and Commissioning, Handover and Remedy of defect of construction of Roads and Infrastructure works for Mohammad Bin Zayed City - Zone D & G, Abu Dhabi and all in accordance to drawings and specifications.
Value: AED 482 million

Al Sader Area Const of International Roads and Infrastructure

Location: Al Sader Area, Abu Dhabi
Client: Abu Dhabi General Services PJSC
Consultant: ITAL Consult Engineering SPA
Duration: 24 Months
Status: In Progress
Details: Construction, Completion, Testing and Commissioning, Handover and Remedy of defect of construction of internal Roads and Infrastructure works for Al Sader Area, Abu Dhabi and all in accordance to drawings and specifications.
Value: AED 294 million

Al Sader Area Const of International Roads and Infrastructure

Location: Emirates of Fujairah, Sharjah & Ras Al Khaimah
Client: Etihad Rail Company PJSC
Consultant: Jacobs Engineering Group
Duration: 48 Months
Status: In Progress
Details: All track components, including but not limited to rails, sleepers, fasteners, rail pads, base plates, ballast, sub-ballast, earthing and bonding, turnouts, crossings, track drainage, slab track, level crossings and signs and markers
Value: AED 4.6 billion

 
INTERNATIONAL PROJECTS
 
 
INTERNATIONAL PROJECTS
 
MARAZA ZAYED DEVELOPMENT

Location: Jordon
Status: Completed



AL QASSABA RESIDENTIAL

Location: Afghanistan
Status: Completed



ARZANA HOTEL & RESIDENCES

Location: Morocco





CANVAS HOTEL

Location: Russia
Status: Completed



URBELA RESIDENCES

Location: Kurdistan, Iraq




KASR AL BAHR

Location: Rabat Hassan, Morocco



KOPAONIK RESORT HOTEL

Location: Serbia
Duration: 17 Months



HOTEL EARTHWORKS FOR ARZANA

Location: Ain Atiq, Morocco





 
FACTORIES
FACTORIES
 
 

OVERVIEW:
• Established in 2006 as LLC company
• The largest Alum. Factories in the Region (4 Divisions/Factories)
• Built on an area of 82,000 sqm
• Fabrication capacity of more than 500,000 sqm of panels per annum
• 1900 qualified team of engineers and labors
• Total work in hand for 2015 is AED 650 million
• ISO Certified 14001:2004 ,9001:2008 & OHSAS 18001:2007


PRODUCT RANGE:
• Double Skin Active Walls
• Conventional Curtain Wall
• Unitized Curtain Wall
• Metal Cladding
• Spider Walls
• Sliding & Casement Windows, Doors
• Shop Fronts, Doors, Windows,
• Balustrades
• Louvres, Grills & Clusters

OVERVIEW:
• Established in 2006
• About 100,000 sqm production facility in Abu Dhabi
• Precast Production Capacity of 1000 m3/day
• Hollow Core Production Capacity of 720 m2/day
• GRC & GRP production Capacity of 420 m2/day
• Blocks : 63000 for one plant
• Tiles : 4400 m2 for one plant
• Kerbston: one plant producing 2200 LM / day
• Over 2000 engineers & skilled labor
• Over AED 300 million work in hand 2015


PRODUCT RANGE
• Masonry blocks – solid, hollow, thermo, and hoardy
• Paving stone – modular, shot blasted, multi-colored & exposed aggregate
• Pre-cast pre-stressed hollow core slabs
• Pre-cast insulated panels
• Solid pre-cast insulated panels
• Boundary wall – exposed aggregate or shot-blasted finishes

OVERVIEW:
• Establish 2009
• Production facility based in Abu Dhabi with total built up area of 5000 sqm.
• Fabrication capacity per year: 12000 tons
• No. of technician and labors: 450
• Total work in hand for 2015 is 70 million AED


PRODUCT RANGE:
• Design, fabrication and erection of pre-engineered and hot roll steel structures
• Hangers, ware houses and showrooms
• Design, fabrication and fix of non structural elements
• Handrails , Ladders, Canopies etc.
• Fabrication of steel molds
• Fabrication of scaffolding

OVERVIEW:
• Established in 2004 in ICAD 1, Abu Dhabi
• Wood Works Manufacturing Facility over an area on 12,000 m2
• Over 250 tech, operators, skilled labor & installers
• Over AED 150 million work in hand 2015


PRODUCT RANGE:
• Cupboards
• Kitchens
• Furniture
• Interior and exterior fit-out
• Bathrooms
• Wardrobes
• Decking
• Customized items
• Gazebos
• Doors
• Bespoke creations

OVERVIEW:
• Established in 2008
• Leading Supplier of all types of ready-mix concrete and cement-based plastering materials.
• Five full automated state-of-the-art batching plants produce 600 cubic meters of concrete per hour.
• Five ice-producing plants , with a production capacity of 400 tons per day.
• Fully integrated laboratory equipped with the latest technology.


PRODUCT RANGE:
• Normal Concrete
• High Performance Concrete
• Self Compacting/Self Levelling Concrete
• Shotcrete
• Long Hauling Concrete
• Screeds